Archive for April, 2006

civil work

Its been almost a month since my last post, yeah well…ive moved into a house near the site and have settled there quite comfortably now. It makes it easier to access the site by living near it.
Work has stated on the interiors and we have completed a part of the civil work. The partition wall separating the kitchen from the dining area has been completed. The picture also shows a part of the open tandoor.The work on the rear stair case would start on Monday. Once that is fixed and ready…it would be easier to access the restaurant without having to use the main entrance. The civil work on the toilets have also been completed.
  
The prototype for the chair design is also ready. We tried to refine and recreate the dhabba and hence the seat for the chair reflects the dhabba cots with its weft and weaves. This looks great and is surprisingly very comfortable. it stands at the standard 36″ in height and is made of Teak wood. We plan to give it a walnut coat along with a polyurethane coating.
  The tables would have a wooden top  finished with 3mm veneer in walnut and metal base which shall later be powder coated.

Leave a Comment

  • Blog Stats

  • Other stats

  • Last FM

  • Meta